Jump to content
Sign in to follow this  
PDXBob

Strange Planned Charging Time/Cost

Recommended Posts

Description: Quick Charger Planned Time Extremely Long
Replication Steps:
  1. Replication
  2. Steps
  3. If applicable
Planning a cross continent trip with my Chevy Bolt. I noticed that the line circled in the trip plan (see attached Casey's Salina (Salina, KS) [Electrify America]) has an extremely long charge time of 5:45 hours and a $74 cost listed. I recompiled several times on my PC, with the same results. I checked the Electrify America app, and there are no out of the ordinary fees associated with this charging station. I'm a first time user of the program (LOVE IT!), and hope this will help.
Edited by PDXBob

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

Contact Us

Bo - Lead Developer and Tesla owner: bo@abetterrouteplanner.com

Jason - New Car Models, Developer and Bolt owner : jason@abetterrouteplanner.com

Idreams - Forums Administrator, Forums Developer and Tesla owner : idreams@abetterrouteplanner.com

×
×
  • Create New...