Jump to content
Jörn

incorrect information about the charging power in charging stations from the german network "comfortcharge"

Recommended Posts

Hi there,

Description: 

Many charging stations in the comfortcharge network have incorrect information about the charging power. accordingly, the charging times in the abrp are incorrectly calculated and the charging stations are sometimes not even included in the route planning. The stations are specified with a maximum charging power of 50 kW/h. In reality, they sometimes have an output of up to 150 kW/h. In this case, according to abrp, the maximum charging power is also specified as 50 kW / h, although it can actually provide 150 kW / h.

I noticed this with all comfortcharge charging stations that I looked at in abrp. this should definitely be fixed. Here you can see the correct description of the example of chaging point: https://www.goingelectric.de/stromtankstellen/Deutschland/Walsrode/Telekom-Saarstrasse-12/45726/ I have already charged there several times with 150 kW / h.

here just another example https://abetterrouteplanner.com/?plan_uuid=d28bc9ba-33df-4955-b038-290b30a52af9https://abetterrouteplanner.com/?plan_uuid=d28bc9ba-33df-4955-b038-290b30a52af9

https://www.goingelectric.de/stromtankstellen/Deutschland/Ludwigsfelde/Telekom-Bruno-Taut-Strasse-2/48353/

 

greetings

Jörn

Type: Was this on the App (please note what version), or webpage (which link?)
App & Website

 

Edited by Jörn
second example added
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


×
×
  • Create New...