Jörn Posted August 19, 2021 Share Posted August 19, 2021 (edited) Hi there, Description: Many charging stations in the comfortcharge network have incorrect information about the charging power. accordingly, the charging times in the abrp are incorrectly calculated and the charging stations are sometimes not even included in the route planning. The stations are specified with a maximum charging power of 50 kW/h. In reality, they sometimes have an output of up to 150 kW/h. In this case, according to abrp, the maximum charging power is also specified as 50 kW / h, although it can actually provide 150 kW / h. I noticed this with all comfortcharge charging stations that I looked at in abrp. this should definitely be fixed. Here you can see the correct description of the example of chaging point: https://www.goingelectric.de/stromtankstellen/Deutschland/Walsrode/Telekom-Saarstrasse-12/45726/ I have already charged there several times with 150 kW / h. here just another example https://abetterrouteplanner.com/?plan_uuid=d28bc9ba-33df-4955-b038-290b30a52af9https://abetterrouteplanner.com/?plan_uuid=d28bc9ba-33df-4955-b038-290b30a52af9 https://www.goingelectric.de/stromtankstellen/Deutschland/Ludwigsfelde/Telekom-Bruno-Taut-Strasse-2/48353/ greetings Jörn Type: Was this on the App (please note what version), or webpage (which link?) App & Website Link to Plan: https://abetterrouteplanner.com/?charger_id=16026497 Edited August 19, 2021 by Jörn second example added Link to comment Share on other sites More sharing options...
Katya-ABRP Posted August 26, 2021 Share Posted August 26, 2021 Hi @Jörn, Thank you for reporting this! I've had a report sent to the data provider so that they can have it corrected at the source. /Katya Link to comment Share on other sites More sharing options...