NREL.gov supplied stations and station status

Question

There is a station listed at 55 Zina St, orangeville, Ontario.  From mobile app or the website's new UI I only see that there is a single station ccs or chademo at 50kw.  I'm always skeptical and curious about details about chargers I've never used before so I check plugshare.  No charger listed at this location.  So i check openchargemap.org. Not here either.  So i go back to abrp and neither the app or the new ui tells me where this station info is coming from. Eventually I try the website on a pc and stumble on that the classic ui still exist and it still has the edit button for the source of this station info. 

The NREL.gov. alternate fuel stations api.  The edit link however leads me to the NREL generic contact page.  Some digging leads me to the below. 

https://afdc.energy.gov/stations/#/find/nearest

"The mobile station locator is part of the Alternative Fuels and Advanced Vehicles Data Center (AFDC) Web site (www.afdc.energy.gov/afdc). It was developed by the National Renewable Energy Laboratory (NREL), which manages the AFDC. The tool is sponsored by the Clean Cities initiative (www.eere.energy.gov/cleancities), a government-industry partnership sponsored by DOE’s Vehicle Technologies Program."

Which also does not show any stations at this location. I can't find any news or anything on Google for a ccs, chademo or ev station near this location either.  I'll hopefully be able to confirm if there is a charger there or not next week. 

Is there a better way to get info about chargers?  Is their api giving you canceled, planned or under construction chargers?  Am I missing where the new ui shows the source of the info like the edit link in the old ui?

Edited by Openair
Link to comment
Share on other sites

2 answers to this question

Recommended Posts

  • 0

1726 Winhara Rd, Gravenhurst, ON is another.  Also from the NREL api.  Also on none of the three station maps mentioned above.  This one appears to be part of Ontario Power generation planned expansion to their Ivy Charge Network announced Feb 2020, to be completed by the end of 2021. Neither station is listed in their app either.  Knowing OPG they haven't even broken ground on these yet.  I would hope abrp could avoid showing this and using them for routes. 

Link to comment
Share on other sites

  • 0

Can confirm there is no ev stations at the 55 zina st, orangeville location. Nothing indicating one will be installed yet even.  My guess is either the status is active instead of planned in the Nrel database (but since this station doesn't show up in their own app that seems unlikely) or you guys are pulling status all (which includes planned stations) instead of status e for available from their api. 

Edited by Openair
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


×
×
  • Create New...