Jump to content

Search the Community

Showing results for tags 'charge'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General Discussion
    • Introductions
    • Trip Reports
    • Planning Lounge
    • Discussion
    • Site Feedback
  • ABRP Feedback
    • Report bug in the ABRP Bug tracker
    • Request a feature in the ABRP bugtracker
    • (Old) Bugs - Use ABRP bugtracker instead
    • (Old) Features - use ABRP bug tracker instead
    • Community Support
    • Vehicle Model Discussions
    • ABRP app
  • Electric Vehicles
    • Tesla
    • BMW
    • Chevrolet
    • Hyundai
    • Jaguar
    • Kia
    • Lucid
    • Nissan
    • Porsche
    • Renault
    • Rivian
    • ŠKODA
    • Volkswagen
    • Polestar

Blogs

  • ABRP Blog

Calendars

  • Community Calendar

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me

Found 3 results

  1. I would like to know more about how ABRP is calculating charge costs after it computes a route so that I can make suggestions for improvements. I just planned a route from Danbury (near the CT/NY border) to Cape Cod, MA. The default route headed NE through MA to take all Interstates with two charges along the way and ABRP estimated the charge cost as over $15. Then I used a waypoint to force ABRP to plan a due E route through CT that was 10 miles shorter (223 miles total) but still included two super chargers that were nearly identical in length to the former case. ABRP estimated charge cost at $11. These estimates cannot be correct. From the results you would think that the MA super chargers were far less cost than the ones in CT. The opposite it true. CT is .36 / Kwh and MA is .29 / Kwh as confirmed by the Tesla app in my car. Further the 10 mile longer route only represents about 2 Kwh of electricity, far less than the $4 difference. The first case does include toll roads. Is ABRP including toll road costs? For the life of me I can't explain the difference. How can I see the calculations ABRP is using?
  2. Description: need the app to export a month worth of charge details (doing it daily is a chore!) Use Case: if the feature could export from one date to another would help. I would then be able to submit to work (who pay the electric bill). even better if we could link the api to Octopus Agile rate api. thanks graeme
  3. Hi ABRP is already great but I would like, when planning a long trip, to be able to include an overnight recharge at a hotel en route so that the app knows I am starting the next leg with a full battery.
×
×
  • Create New...